News releases
04/21/2026
Overnight ramp closures and detours at I-495 and Dulles Toll Road Interchange scheduled tonight, Tues., April 21 and Wed., April 22
Single lane closure on WB Dulles Toll Road between Route 123 and I-495 also planned
FAIRFAX, VA - Ramp closures and detours are planned at the I-495 and Dulles Toll Road (Route 267) interchange tonight, Tuesday, April 21, and tomorrow night, Wednesday, April 22. These closures are necessary to accommodate milling and paving operations as part of the 495 NEXT project. In the event of inclement weather or other delays, this work will be rescheduled for the following night.
04/13/2026
Nightly closures of ramps at I-495 and George Washington Memorial Parkway and Georgetown Pike in McLean scheduled for April 13-17
Closures needed for milling, paving and bridge work; Motorists should follow posted detours
FAIRFAX, VA - Beginning on or about tonight, Monday, April 13, and continuing nightly through Friday night, April 17, ramps to and from I-495 (Capital Beltway) at the George Washington Memorial Parkway (GWMP) and Georgetown Pike interchanges will be closed and detoured for 495 NEXT crews to perform milling, paving and bridge work. Ramp closures will occur from 10 p.m. to 5 a.m. the following morning and will follow the schedule below, weather permitting. Drivers should follow posted detours and use caution.
04/08/2026
Nightly closures and detours at Dulles Toll Road and I-495 Interchange in McLean scheduled this weekend, April 10-12
Full closure of EB Dulles Toll Road required for overhead sign work; Additional nightly ramp closure and detour at EB Dulles Toll Road to NB 495 Express Lanes scheduled next Mon.-Wed., April 13-15
FAIRFAX, VA - Beginning on or about Friday night, April 10, and continuing nightly through Sunday night, April 12, all lanes of eastbound Dulles Toll Road (Route 267) will be closed and detoured between Route 7 (Leesburg Pike) and the I-495 (Capital Beltway) interchange in McLean. Closures will be in place starting at 10 p.m. each night through 5 a.m. the following morning. These closures are to accommodate overhead sign work as part of the 495 NEXT project.
Last updated: June 4, 2024
